Xiangjiang Caijiazhou Sand and Stone Overturning Dam Project
The project is located in the Caijiazhou section of the Xiangjiang River, Gaotangling Town, Wangcheng District, Changsha City. The project covers a range of 1.5km upstream and 2.5km downstream of the dam axis, with a construction scale of 36 million tons per year of transportation capacity through the dam. The designed representative ship types are 500-ton class and 2000-ton class. The total investment is approximately 317.23 million yuan. The entire project is divided into three areas: downstream mobile belt conveyors, middle pipe belt conveyors, and upstream ship loading luffing belt conveyors, including a total of 4 pipe belt conveyors, 104 belt conveyors, 24 transfer stations and 16 distribution hoppers.